logo

Water Treatment Plants in Chengalpattu

Greenly Environmental we design, manufacture and install high-performance water-treatment plants throughout Chengalpattu district. From Mahabalipuram’s beach resorts to the Oragadam auto hub, our corrosion-proof reactors recycle 30–50 % of water and keep every client 100 % TNPCB-compliant.

Why Chengalpattu Chooses Greenly<br />

Why Chengalpattu Chooses Greenly

Local technical team for same-day service and rapid spare delivery

End-to-end TNPCB paperwork—CTE, CTO and monthly reports done for you

Marine-grade FRP / SS-316 construction to resist salty sea air

Solar-hybrid options that slash operating costs up to 35 %

200 + installations delivered over 12 years in the district

Our Core Water-Treatment Solutions

<br />
Effluent Treatment Plants

Effluent Treatment Plants (ETP)

Automotive, food-processing & resort kitchens

Capacities 5 KLD – 5 MLD

Heavy-metal removal & oil-water separation

ZLD add-ons for near-zero discharge

<br />
Sewage Treatment Plants

Sewage Treatment Plants (STP)

Apartments, hotels, hospitals, IT parks

MBR for direct-reuse luxury resorts

MBBR for high-BOD industrial zones

Reuse in landscape irrigation, cooling towers & flushing

<br />
Reverse-Osmosis (RO) Systems

Reverse-Osmosis (RO) Systems

High-TDS borewells & process water

Capacities 1 000 LPH – 200 000 LPH

Treats coastal groundwater 800–5 000 ppm TDS

Skid-mounted for quick factory fit-outs

<br />
Sea-Water Desalination

Sea-Water Desalination (SWRO)

Beach resorts & coastal industries

Recoveries up to 50 % with energy-recovery turbines

Optional solar-RO hybrid for off-grid savings

Chengalpattu-Specific Water Challenges & Solutions

Challenge Our Solution
High coastal salinity Advanced BWRO/SWRO systems
Corrosion from sea air FRP/SS 316 construction
Tourism season surges Load-flexible STP designs
Industrial pollution ETPs with tertiary treatment
TNPCB compliance Documentation & audit support

Recent Chengalpattu Projects

Mahabalipuram Beach Resort

20,000 LPD Sea Water RO Plant TDS reduced from 35,000 to <500 ppm

Oragadam Automotive Plant

100 KLD ETP with ZLD 95% water recovery achieved

Kelambakkam IT Park

75 KLD MBR STP 100% reuse for AC cooling towers

Five-Step Delivery Process

Free site assessment – water testing & demand mapping

Custom design – GA / PP drawings & P&IDs tailored to influent quality

Coastal-proof manufacturing – built in our Oragadam facility with marine-grade materials

Turnkey installation – by certified Chengalpattu technicians

Training & AMC – bilingual (Tamil / English) manuals, 24 × 7 helpline & scheduled maintenance

<br />
Why Chengalpattu Chooses Greenly

Why Chengalpattu Chooses Greenly

Coastal Water Treatment Specialists

TNPCB Approval Expertise

Local Service Centers in Oragadam & Kelambakkam

Solar-Hybrid Solutions

Water Reuse Guarantee

Chengalpattu Water Treatment FAQs

1. How does coastal air affect treatment plants?

We use marine-grade materials (FRP/SS 316) to prevent salt corrosion – critical for coastal Chengalpattu installations.

2. Can we treat seawater for drinking?

Yes! Our SWRO plants desalinate seawater to drinking standards – ideal for Mahabalipuram resorts.

3. What maintenance is required?

Our AMC packages include:
• Monthly membrane cleaning
• Quarterly sensor calibration
• Bi-annual pump servicing
• 24/7 emergency support

4. Are subsidies available?

Chengalpattu projects qualify for:
• Smart City Mission grants
• Tourism Department subsidies
• CMWSSB water recycling incentives

5. How long do installations take?

• RO Plants: 7-15 days
• ETP/STP: 3-6 weeks
• Urgent projects: Expedited options available