logo

STP Plant Process & Technology

TrueWaters Solutions is India’s trusted name in wastewater recycling. With 1,500+ commissioned plants and over two decades of field expertise, we transform sewage into a reusable asset while keeping you compliant with CPCB and NGT discharge standards.

Why Choose TrueWaters Solutions?

Why Choose TrueWaters Solutions?

Proven Track Record – 500+ clients across manufacturing, hospitality, and real estate sectors.

Compact, Plug and Play Design – minimal footprint; rapid on site assembly.

Technology Flexibility – EA, SAFF, SBR, MBBR, and MBR to match your load profile

Fast ROI – typical payback within 18–24 months via water purchase savings.

Capacity & Technology Matrix

Capacity Band Recommended Technology Typical Applications
5–25 KLD MBBR / EA Small factories, stand alone hotels
25–200 KLD SBR / MBR Residential societies, hospitals
200 KLD–1 MLD SBR / SAFF Industrial parks, townships
>1 MLD Custom Hybrid Lines Municipal corporations

How a Compact STP Works (3 Step Overview)

Primary Treatment – Solids Removal. Inlet screening and grit separation.Settling tank removes ~30 % suspended solids.

Secondary Treatment – Biological Digestion .Aerobic microbes break down dissolved organics.BOD & COD drop to permissible limits.

Tertiary Treatment – Polishing & Disinfection .Nitrification–denitrification, phosphorus precipitation.UV irradiation delivers odor free, pathogen free water fit for reuse.

Key Benefits at a Glance

Z

Up to 90 % water recovery rate.

Z

 Footprint as low as 0.15 m² per KLD.

Z

24×7 PLC based automation reduces operator effort.

Z

Noise <70 dB, odor controlled enclosures.

Z

Remote monitoring via IoT dashboard.

Frequently Asked Questions

What capacity variants are available?

 Standard units start at 5 KLD and scale modularly to 100 MLD.

Are TrueWaters STP plants CPCB & NGT compliant?

Yes—every design meets or exceeds the latest effluent discharge norms.

How much space does a 50 KLD compact STP need?

Around 85–90 m², including maintenance access.

What is the power consumption?

Approximately 0.25–0.35 kWh per m³ of treated water, depending on process.

What is the payback period?

Most commercial installs recover cost within two years via reduced freshwater purchase and lower sewage haul fees.