Sewage treatment plant in kanchipuram
Greenly Environmental, we design and install high-efficiency sewage treatment plants across Kanchipuram district. Our compact, low-maintenance STPs help apartments, hotels, hospitals and industries recycle 90-100% of wastewater while meeting TNPCB pollution control norms.
Why Choose Our Kanchipuram STP Solutions?
Kanchipuram-based installation team – Quick service response
TNPCB-compliant designs – Approval assistance included
3X more compact than conventional plants
Odor-free operation with advanced biofilters
Reuse treated water for gardening/flushing
Our Kanchipuram STP Technologies

MBR (Membrane Bio-Reactor) STP
Best for: Luxury apartments, hospitals, hotels
Output Quality: Suitable for reuse
Footprint: 1.2 sq.m per KLD

SBR (Sequential Batch Reactor) STP
Best for: Schools, hostels, small industries
Automated operation with timer controls
Lowest power consumption

Conventional ASP STP
Best for: Large communities, townships
Proven technology with easy maintenance
Capacity: Up to 5 MLD

Packaged STP Units
Pre-fabricated containerized systems
Ideal for: Temporary camps, construction sites
Quick installation in 3-5 days
Quick Kanchipuram STP Sizing Guide
| Property Type | Recommended STP Size | Typical Space Needed |
|---|---|---|
| 20-unit apartment | 15 KLD | 4 m × 3 m |
| 100-room hotel | 30 KLD | 5 m × 4 m |
| 500-bed hospital | 75 KLD | 8 m × 6 m |
| Industrial campus | 50–500 KLD | As per design |
Recent Kanchipuram STP Installations
Kanchipuram Silk Saree Unit
25 KLD MBR STP,100% water reuse for dyeing process
Sriperumbudur Engineering College
50 KLD SBR STP,Treated water for campus gardening
Oragadam Industrial Guest House
10 KLD Packaged STP,Installed in just 3 days
Kanchipuram-Specific Advantages
Hard-water tolerant membranes for mineral-rich groundwater
Load-flex management to handle festival surges at temples
Ultra-quiet blowers for dense residential blocks
Full TNPCB documentation—CTE, CTO & monthly online returns
Our Five-Step STP Delivery Process
✔
Free site visit – soil test, hydraulic study & space audit
Tailored design – detailed GA/PP drawings & P&IDs
✔
✔
Approval support – submission of CTE/CTO files to TNPCB
Turnkey installation – by certified local technicians
✔
✔
Training & AMC – bilingual (Tamil/English) manuals + 24×7 helpline
Why Kanchipuram Prefers Greenly
150 + STPs delivered across the district
10-year TNPCB compliance record, zero rejections
Oragadam service hub for rapid spares & support
Guaranteed effluent quality—we write it into the contract
Kanchipuram STP FAQs
1. Is STP mandatory in Kanchipuram?
Yes, for:
• Apartments >20 units
• Hotels >10 rooms
• All industries as per TNPCB rules
2. What maintenance is needed?
Our AMC package includes:
• Monthly sludge removal
• Quarterly membrane cleaning
• Bi-annual motor servicing
3. Can STP water be reused?
Yes, for:
- Garden irrigation
- Toilet flushing
- Cooling towers (with tertiary treatment)
4. How long does installation take?
• Packaged STPs: 3-5 days
• Custom plants: 2-4 weeks
5. Are there government subsidies?
Kanchipuram projects may qualify for:
• TN Urban Development Fund
• Smart City Mission grants
• Textile cluster water recycling incentives
