logo

Sewage Treatment Plants in Tiruvallur

Greenly Environmental, we design, manufacture and install advanced sewage treatment plants (STPs) across Tiruvallur district. Our space-saving reactors recycle 90–100 % of wastewater, cut freshwater bills and guarantee full TNPCB compliance.

Why Tiruvallur Chooses Greenly STPs

Local manufacturing hub in Poonamallee for rapid turnarounds

End-to-end TNPCB paperwork—CTE, CTO and online returns

50 % smaller footprint than conventional plants; perfect for tight plots

Odour-free thanks to multi-stage bio-filter technology

Treated-water reuse for gardening, flushing, cooling towers & vehicle washing

Why Tiruvallur Chooses Greenly STPs

Our STP Technologies for Tiruvallur


MBR (Membrane Bio-Reactor) Technology

MBR (Membrane Bio-Reactor) Technology

Best for: Luxury apartments, hospitals, hotels

Output Quality: Suitable for reuse

Footprint: 1.2 sq.m per KLD

Sequential Batch Reactor

SBR (Sequential Batch Reactor) STP

Best for: Schools, hostels, small industries

Automated operation with timer controls

Lowest power consumption


Conventional ASP Technology

Conventional ASP Technology

Best for: Large communities, municipalities

Proven technology with easy maintenance

Capacity: Up to 10 MLD


Containerized Packaged STPs

Containerized Packaged STPs

Pre-fabricated containerized systems

Ideal for: Temporary camps, construction sites

Installation in 72 hours

STP Capacity Guide for Tiruvallur

Property Type Recommended Capacity Space Required
25 Apartments 20 KLD 5m x 4m
50-Room Hotel 30 KLD 6m x 5m
200-Bed Hospital 50 KLD 8m x 6m
Industrial Unit Custom (25-500 KLD) As per design

Recent Tiruvallur STP Installations

Tiruvallur Textile Park

100 KLD MBR STP,100% water reuse in dyeing process

Sriperumbudur IT Park

75 KLD SBR STP,Treated water for landscape irrigation

Poonamallee Resort

15 KLD Packaged STP,Installed in just 3 days

Tiruvallur-Specific Advantages

Z

Hard-water-resistant membranes to tackle high-TDS borewell feed

Z

Load-fluctuation buffers for industrial belts (Ambattur, Tirumazhisai)

Z

Silent blowers for dense residential layouts

Z

Complete TNPCB liaison so you focus on core operations

Our Five-Step STP Delivery Process

Free site assessment – soil test, hydraulic study & layout planning

Custom design – GA/PP drawings, P&IDs & BOQs tailored to your influent

Approval documentation – we file all CTE/CTO forms and respond to queries

Turnkey installation – executed by certified Tiruvallur technicians

Training & AMC – bilingual (Tamil/English) manuals plus 24 × 7 helpline


Why Tiruvallur Chooses Greenly STPs

Why Tiruvallur Chooses Greenly STPs

200+ STPs installed in Tiruvallur district

12-year TNPCB compliance record

Dedicated service center in Poonamallee

Guaranteed treated water parameters

Tiruvallur STP FAQs

1. Is STP mandatory in Kanchipuram?

Yes, mandatory for:
• Apartments >20 units
• Hotels >15 rooms
• All industries as per TNPCB rules

2. What maintenance is required?

Our AMC package includes:
• Monthly sludge removal
• Quarterly membrane cleaning
• Half-yearly mechanical checks

3. Can we reuse STP water?

Yes, for:

  • Garden irrigation
  • Toilet flushing
  • Vehicle washing (with tertiary treatment)
4. Installation timeline?

• Packaged STPs: 3-5 days
• Custom plants: 3-6 weeks

5. Any government subsidies?

Tiruvallur projects may qualify for:
• TNUDF grants
• CMWSSB water recycling incentives
• MSME technology upgradation schemes